+962 6 5511441 info@aloula-aljadeda.com

Projects Gallary

Waterproofing & Insulations

Al-Karamah Project

 

We implemented the foundation columns and high-strength concrete walls for the Tamr Processing and Packaging Factory.

Gardens Area Project

 

We used a Rust Free Powder for steel treatment, followed by BENFER CURE for concrete wall repair.
This process enhances compressive strength up to 450 kg/cm², resulting in a highly durable concrete structure with excellent resistance to environmental factors.

Al-Amin Palace

 

We Applied PU700 insulation for concrete surfaces and tiles.
Its high flexibility, reaching up to 800%, creates a complete water barrier that prevents leakage to lower floors.
In addition, it reduces surface temperature during summer when the white color is used.

Hilton Hotel Swimming Pool

 

We used T75 material for surface leveling and filling gaps that appear on swimming pool walls.
This material is known for its high compressive strength and ease of application.

Shafa-Badran Area Villa

 

We have applied Micro Concrete for flooring, especially swimming pools, to achieve high-strength, crack-resistant surfaces with superior durability.